‘RW & PROTECTION WALL’ CONSTRUCTIONS

Description of Work: Construction of Retaining (RW) and Protection Walls from ‘Gebze-Pendik’ and ‘Bostancı-Kadıköy’ Locations at Asia 1 & 2 sections on Marmaray CR3 Railways contracts

Project Comprising of

  • Supply Plants & Equipments, Installation, Testing
  • Installation of C30 Concrete Castings: 7.809 m ³
  • Installation of Re-bars (Ø8-Ø32mm): 724,55 Ton
  • ...

Total Contract Value : 2.245.580,00-TL
Client : Obrascon Huarte & Siemens J.V
Location : Istanbul/TURKEY
Completed Date : 2017

Share

‘RW & PROTECTION WALL’ CONSTRUCTIONS

Description of Work: Construction of Retaining (RW) and Protection Walls from ‘Gebze-Pendik’ and ‘Bostancı-Kadıköy’ Locations at Asia 1 & 2 sections on Marmaray CR3 Railways contracts

Project Comprising of

  • Supply Plants & Equipments, Installation, Testing
  • Installation of C30 Concrete Castings: 7.809 m ³
  • Installation of Re-bars (Ø8-Ø32mm): 724,55 Ton
  • Installation of Doka Single sided Formworks: 12.500 m²
  • Installation of Doka Double sided Formworks: 1.000 m²
  • Inst. of (PVC)WaterStoper : 3.505mt, Drainage Layer: 3.505 m²
  • Inst. of Sika Swelling Tape: 1.600 mt, Expansion Joint: 450 mt
  • Installation of Wall, Floor, Climbing, Load-Bearing Safety systems
  • Installation of Timber, Compozit FW beams, Sheets, Floor props
  • C40 Concrete, Re-bars provided by Client (Labour Cost Contract)

Total Contract Value : 2.245.580,00-TL
Client : Obrascon Huarte & Siemens J.V
Location : Istanbul/TURKEY
Completed Date : 2017